Asbestos in a demolition: the NSW rules

NSW rules for asbestos in a demolition: the register, licence classes, the 5-day notice, clearance and EPA waste tracking. From a Class B licensed removalist.

5.0 from 22 Google reviews
Worker in protective clothing beside removed building material
HaberfieldHouse demolition · Our work
View the work
  • Checked against the sources10 October2026
  • Sources10 linkedListed at the end of the guideSee the sources
  • Reading time3 min6 sections
  • Written by a licensed contractorAD204777NSW demolition licenceCheck the register

The short answer

Asbestos has to be found and, so far as reasonably practicable, removed before a demolition starts: the demolition contractor gets the asbestos register first.

Over 10 m² of non-friable asbestos needs a Class B licence and friable asbestos a Class A licence, with a SafeWork notice 5 days ahead, a clearance certificate after, and tracked disposal at a licensed landfill.

In this guide8 sections

Do you need an asbestos survey before demolition?

In practice, yes: the asbestos has to be found before anything is disturbed. The SafeWork NSW demolition code of practice says whoever carries out the demolition must get a copy of the asbestos register first, and asbestos likely to be disturbed is removed before demolition, so far as is reasonably practicable.

A pre-demolition asbestos survey, often just called an asbestos report, is how a house gets that information: the building is inspected and samples of suspect material are tested in a laboratory. A photo or the age of a building can’t confirm asbestos; only the test does.

Send any survey, register or test result with your demolition brief. If you don’t have one, tell us where the suspect material is, and we’ll talk through the right assessment. Don’t break off a piece to photograph or test it yourself.

02Your situation

What is already known?

IfA report or register is available
ThenSend it with the area affected and the demolition or renovation you’re planning.
IfMaterial is uncertain
ThenTell us where it is without disturbing it, and we’ll talk through the right assessment.
IfRemoval is being arranged
ThenConfirm who does the work, their licence class, and how disposal and clearance are handled.

Who can remove it: Class A and Class B

Up to 10 m² of non-friable asbestos can be removed without a licence. More than 10 m² of non-friable asbestos needs a Class B licence holder, and friable asbestos, in any amount, needs a Class A licence holder.

Our own team removes non-friable asbestos under our Class B licence, AD211698. Friable asbestos goes to licensed asbestos removal subcontractors, and your quote names who does the work.

Notices and plans before licensed removal

The licensed removalist notifies SafeWork NSW 5 calendar days before licensed removal starts, prepares a site-specific asbestos removal control plan, and tells the occupier, the owner and the immediate neighbours before work begins.

Asbestos work changes when the demolition can start, so settle the removal, disposal and clearance before you lock in dates. If suspect material turns up during the job, that area stops until it is assessed, and we tell you what it means for the scope before any extra work goes ahead.

Clearance before anyone goes back in

After licensed removal, the area is inspected and a clearance certificate issued before it is used again. For Class B work a competent person does it; for Class A work it is an independent licensed asbestos assessor, who also carries out air monitoring. Air monitoring isn’t required for Class B work.

If your demolition has a CDC and more than 10 m² of bonded asbestos or any friable asbestos comes out, your certifier needs the signed contract with the licensed removalist and the landfill receipt.

Waste and paperwork

Asbestos waste is kept apart from ordinary demolition rubble. It is wrapped in heavy-duty plastic, carried in a covered, leak-proof vehicle, with friable asbestos in a sealed container, and taken only to a landfill licensed to accept it.

Since February 2024, loads of 100 kg or more, or 10 m² or more of sheeting, are tracked through the NSW EPA’s Integrated Waste Tracking Solution. Keep the clearance certificate and the waste records with your project documents.

What to include in your enquiry

Send the address, the type of property, the affected area and the renovation or demolition you’re planning. Attach any reports and photos taken without disturbing the material, and tell us whether the property is occupied and how we get in.

If you’re not sure how much there is or what it is, say so. A proper assessment is worth more than a precise price built on a guess.

Official sources

Checked 10 October 2026. Your council or certifier confirms what applies to your property.

Get a free quote

Let’s make room
for what’s next.

Tell us what you’re planning and where the job is. We’ll talk through the work and arrange any site assessment needed for a written quote.

0402 548 0047 days a week · 7am–7pm
  1. We talk it throughThe work, what stays and when you need it done.
  2. We look at the siteWhere the job needs it, before we price the work.
  3. You get a written quoteThe scope, separately priced items and the agreed finish.
5.0 from 22 Google reviews

Tell us about the job

* Required fields

Your details
The site and the work
Work needed, what stays, access and timing.
Add photos or plans Optional
Up to 5 photos or PDF plans, 4 MB in total. You can add them in more than one go.
PDF plan requirements

Up to 100 pages, without passwords, comments, markups, fillable fields or scripts. If a PDF won’t go through, send photos of the pages instead.

We only use these details to reply to your enquiry. Privacy policy.