Do you need an asbestos survey before demolition?
In practice, yes: the asbestos has to be found before anything is disturbed. The SafeWork NSW demolition code of practice says whoever carries out the demolition must get a copy of the asbestos register first, and asbestos likely to be disturbed is removed before demolition, so far as is reasonably practicable.
A pre-demolition asbestos survey, often just called an asbestos report, is how a house gets that information: the building is inspected and samples of suspect material are tested in a laboratory. A photo or the age of a building can’t confirm asbestos; only the test does.
Send any survey, register or test result with your demolition brief. If you don’t have one, tell us where the suspect material is, and we’ll talk through the right assessment. Don’t break off a piece to photograph or test it yourself.
02Your situation
What is already known?
- IfA report or register is available
- ThenSend it with the area affected and the demolition or renovation you’re planning.
- IfMaterial is uncertain
- ThenTell us where it is without disturbing it, and we’ll talk through the right assessment.
- IfRemoval is being arranged
- ThenConfirm who does the work, their licence class, and how disposal and clearance are handled.
Who can remove it: Class A and Class B
Up to 10 m² of non-friable asbestos can be removed without a licence. More than 10 m² of non-friable asbestos needs a Class B licence holder, and friable asbestos, in any amount, needs a Class A licence holder.
Our own team removes non-friable asbestos under our Class B licence, AD211698. Friable asbestos goes to licensed asbestos removal subcontractors, and your quote names who does the work.
Notices and plans before licensed removal
The licensed removalist notifies SafeWork NSW 5 calendar days before licensed removal starts, prepares a site-specific asbestos removal control plan, and tells the occupier, the owner and the immediate neighbours before work begins.
Asbestos work changes when the demolition can start, so settle the removal, disposal and clearance before you lock in dates. If suspect material turns up during the job, that area stops until it is assessed, and we tell you what it means for the scope before any extra work goes ahead.
Clearance before anyone goes back in
After licensed removal, the area is inspected and a clearance certificate issued before it is used again. For Class B work a competent person does it; for Class A work it is an independent licensed asbestos assessor, who also carries out air monitoring. Air monitoring isn’t required for Class B work.
If your demolition has a CDC and more than 10 m² of bonded asbestos or any friable asbestos comes out, your certifier needs the signed contract with the licensed removalist and the landfill receipt.
Waste and paperwork
Asbestos waste is kept apart from ordinary demolition rubble. It is wrapped in heavy-duty plastic, carried in a covered, leak-proof vehicle, with friable asbestos in a sealed container, and taken only to a landfill licensed to accept it.
Since February 2024, loads of 100 kg or more, or 10 m² or more of sheeting, are tracked through the NSW EPA’s Integrated Waste Tracking Solution. Keep the clearance certificate and the waste records with your project documents.
What to include in your enquiry
Send the address, the type of property, the affected area and the renovation or demolition you’re planning. Attach any reports and photos taken without disturbing the material, and tell us whether the property is occupied and how we get in.
If you’re not sure how much there is or what it is, say so. A proper assessment is worth more than a precise price built on a guess.
Official sources
Checked 10 October 2026. Your council or certifier confirms what applies to your property.
- SafeWork NSW: Demolition work code of practice (PDF) (opens in a new tab)
- SafeWork NSW: Class B asbestos removal licence (opens in a new tab)
- SafeWork NSW: asbestos removal notifications (opens in a new tab)
- SafeWork NSW: working as a licensed asbestos removalist (opens in a new tab)
- SafeWork NSW: How to safely remove asbestos code of practice (PDF) (opens in a new tab)
- NSW Planning circular PS 21-036: asbestos in exempt and complying development (PDF) (opens in a new tab)
- NSW EPA: tracking asbestos waste with IWTS (opens in a new tab)
- NSW EPA: transporting waste (opens in a new tab)
- NSW Government: disposal of asbestos waste (opens in a new tab)
- SafeWork NSW: work health and safety legislation (opens in a new tab)





