Look the number up on the register
SafeWork NSW points to the NSW Government’s Verify licence register, which lists high risk work, asbestos and demolition licence holders. Search the licence number from the quote and check three things: the name matches the business quoting you, the class covers your job, and it hasn’t expired.
Try it on ours. Our restricted demolition licence is AD204777, held since 2007 and current to 8 October 2028. Our non-friable (Class B) asbestos removal licence is AD211698, held since 2013 and current to 14 November 2028.
Restricted or unrestricted: which demolition licence your job needs
Load-bearing demolition of a structure 6 metres or more high is licensed work. A restricted licence covers load-bearing demolition between 6 and 15 metres high, and load-shifting machinery on a suspended floor. Licences last 5 years.
An unrestricted licence is needed for work over 15 metres, chemical installations, tower cranes or mobile cranes rated over 100 tonnes, pre- or post-tensioned structures, floor propping and explosives. Ours is a restricted licence, so that is the work we don’t do, and it is the scale of most Sydney houses, garages and low-rise buildings.
Asbestos licences: Class A and Class B
Up to 10 m² of non-friable asbestos can be removed without a licence. A Class B licence covers more than 10 m² of non-friable asbestos; only a Class A licence covers friable asbestos.
If a quote includes friable asbestos and the business holds Class B, ask who the Class A subcontractor is and check their licence the same way. We use licensed subcontractors for friable asbestos and name them in the quote.
04Compare
Which licence your job needs
| The work | Licence to look for |
|---|---|
| Load-bearing demolition 6 to 15 metres high | Restricted or unrestricted demolition licence |
| Over 15 metres, explosives, big cranes, propping or tensioned structures | Unrestricted demolition licence |
| Up to 10 m² of non-friable asbestos | No licence needed, though a licensed removalist can do it |
| More than 10 m² of non-friable asbestos | Class B (or Class A) asbestos removal licence |
| Any friable asbestos | Class A asbestos removal licence |
Ask for the insurance certificates
Licences aren’t on the register alone; insurance needs its own paperwork. Ask for certificates of currency and read the amounts and expiry dates.
Ours: $20 million public liability and $20 million asbestos liability, with the current certificate to 30 November 2026, and workers compensation through icare NSW.
Then compare the same job
Give every contractor the same plans, access photos and removal boundaries, and list what stays as clearly as what goes. A low total can simply describe a smaller job, so compare the demolition, concrete, extra structures, asbestos, waste and finish line by line, and check GST.
Ask who handles approvals, utility disconnections and the SafeWork notice, and how extra work is agreed and recorded.
Agree the handover and how you’ll stay in touch
Confirm your point of contact, how extra work is approved and the condition the block is handed over in. Keep the quote, any agreed changes and the project records together.
Once the licences and the scope check out, the comparison comes down to the work your project needs. Send your plans and site details if you’d like us to price your demolition.
Official sources
Checked 10 October 2026. Your council or certifier confirms what applies to your property.





