Strip outs & internal demolition in Sydney
Strip it back. Protect the rest.
Kitchens, bathrooms, laundries, offices and shops stripped back, and walls or roof sections taken out, with what stays listed in your quote and protected while we work.
5.0 from 22 Google reviewsStrip-out or partial demolition?
- Restricted demolition licenceAD204777Held since 2007Check the register
- Non-friable asbestos licenceAD211698Held since 2013Check the register
- Insured on every job$20M + $20MPublic & asbestos liabilityOur insurance
- Experience30+ yearsIn demolition
The strip-out scope
Strip it out,
or take part down?
A strip out readies a building for the renovators; a partial demolition takes away part of the structure. Plenty of renovations need both.
Our strip-out in Petersham
Back to
the framing.
An asbestos-related strip-out before a demolition: internal sheets and linings removed around exposed framing, beams and temporary supports, with the crew in coveralls and respirators.
Customer reviews
Good work.
In their words.
Great work every time. Clean, efficient and punctual.
Professional and helpful during the entire process and took great care in leaving the place spotless and safe.
Good price, respectful, attended to detail for us, on time and on budget.
Working with Sydney’s builders, certifiers and trades
Kitchens and wet areas
Kitchens, bathrooms
and laundries.
Most home renovations start in these rooms. We agree what comes out and what stays room by room, so the next trade starts on a clean, protected space.
What comes out
Cabinets, benchtops, vanities, fixtures, tiles and the wall and floor linings you’re replacing, sorted and taken away.
What stays protected
Floors, doors and the rooms either side, plus the services your plumber and electrician will reconnect, covered and kept clear of the work.
Older wet areas
Laundries and bathrooms from before 1990 can have fibro linings that contain asbestos. They’re tested first, and our own team removes non-friable sheeting, as we did in a Middle Cove laundry and toilet.
The Middle Cove job

Partial demolition
Take out a wall,
keep the rest?
Yes. When a wall, a section of roof or part of the building comes out, the method depends on how it connects to what stays. Structural changes are agreed with the right professional advice first.
Getting material out
Stairs, doorways, corridors and shared areas between the work and the truck.
Keeping other areas in use
Who stays in the building, shared services and surfaces that remain, with the work area separated and protected.
How a strip-out runs
Room by room,
to a clean start.
Five stages, in the order they happen. In an older building, the linings are checked before anything comes out.
Before work starts
- 01Free quote
What goes, what stays
The rooms, the fixtures and finishes coming out, what stays and the condition we leave it in, listed in your quote.
- 02Older buildings
Older linings tested
Fibro linings, wet areas, eaves and some floor coverings can contain asbestos. An assessment, with lab testing where needed, comes first.
On site
- 03Where present
Asbestos out first
Non-friable asbestos removed under our own licence, friable by licensed subcontractors, then an independent assessor clears the area.
- 04Room by room
Protect, then strip
Floors, doors, the rooms either side and the services your trades reconnect are covered while the fixtures and finishes come out.
- 05Agreed finish
Ready for the next trade
Material sorted and taken away, and the work area cleared to the condition in your quote.
People can often keep using the rest of the building, with the work area separated and protected.
Asbestos removalStrip-out costs
What will
a strip-out cost?
Strip outs and partial demolition are quoted on what comes out, what stays and how material leaves the building. Quotes are free, and these are typical Sydney prices for common strip-outs.
- What’s coming out
- Fixtures, finishes and internal elements, room by room.
- What stays
- Retained finishes, services and structure, and how they’re protected.
- Getting material out
- Stairs, lifts, corridors and the distance to the truck.
- Structural work
- Partial demolition is assessed on its own, with the right advice.
Typical Sydney prices
A planning guide: we quote every site in writing, and the quote is free. Checked 12 October 2026.
Room strip-outs
| Job and what the figure covers | Typical range |
|---|---|
| Kitchen strip-out, standard kitchenGST may be extra. Cabinetry, benchtop, splashback and appliances out, walls left standing. Waste removal $400–$900 on top; a small galley costs less, a large kitchen up to $6,000. | $1,500–$3,000per kitchen |
| Bathroom strip-out and disposalInc. GST, including disposal. | $1,150–$3,450per bathroom |
| Laundry strip-outGST may be extra. For a 4–6 m² laundry with a 2–3 m³ skip. | $600–$1,500per laundry |
Home and office strip-outs
| Job and what the figure covers | Typical range |
|---|---|
| Home interior strip-outGST may be extra. Kitchens, bathrooms, floor coverings, linings and non-structural walls; a kitchen and bathroom in an occupied home is $2,500–$6,000. | $1,500–$5,000per job |
| Office strip-outGST may be extra. $30–$50 basic, $50–$80 standard, $80–$150 or more for complex tenancies. | $30–$150per m² |
What these prices cover. For non-structural strip-outs with the walls and structure left standing. Asbestos, structural work and difficult access (stairs, lifts, long carries) are usually priced on top.
Strip-outs across Sydney
Do you work
in my area?
Find strip-outs and internal demolition in your suburb or region.
All strip outs & internal demolition locationsStrip-out questions
Strip-out questions,
answered.
What to send for your strip outs & internal demolition quote
- Plans or marked-up photos showing removal boundaries
- Whether any part of the building stays occupied
- Access and material removal route
- Existing material assessments and structural information
Photos and plans help, but you can enquire without them.
How much does a kitchen or bathroom strip-out cost?
As a typical Sydney price, a standard kitchen strip-out is $1,500–$3,000 per kitchen (GST may be extra) and a bathroom $1,150–$3,450 per bathroom with disposal, inc. GST. Asbestos behind the linings, structural work and difficult access are priced on top, and your free written quote sets your price.
Can a partial demolition be quoted as a smaller full demolition?
No. Keeping neighbouring structures and finishes adds access, protection and structural requirements that floor area alone doesn’t show, so it’s assessed on its own.
Can materials be salvaged?
Items you nominate before the quote is finalised can be set aside, depending on their condition and how they come out. We agree the specific items rather than assuming everything can be reused.
Can people keep using the rest of the building?
Often, yes. The work area is separated and protected, and the route material takes out is planned around shared stairs, lifts and corridors.
What if there’s a safety concern during the work?
Keep out of the work area and call the site contact, who is agreed before work starts, along with how neighbours can raise a concern. For immediate danger, call emergency services.
Is a quote free?
Yes, by phone or through the form. If a job needs testing, reports, professional advice or approval work, those costs are agreed with you before anything is ordered.

Get a free quote
Get your free strip out quote
Show us the rooms, the finishes that stay and the condition your builder or next trade needs.
0402 548 0047 days a week · 7am–7pm- We talk it throughThe work, what stays and when you need it done.
- We look at the siteWhere the job needs it, before we price the work.
- You get a written quoteThe scope, separately priced items and the agreed finish.
















