Asbestos removal
Bondi
02 photographs
About 12 m² of asbestos ceiling sheeting taken down from a garage for Trojan Demolition.
The challengeA morning turnaround, with the job finished by 10am on 24 August.
116 photographs · 16 Sydney jobs
Houses coming down, tight sites dug out, asbestos removed and blocks cleared, all photographed on our own jobs. Choose the kind of work, or open a job and step through every photograph full screen.
5.0 from 22 Google reviewsEvery photograph, job by job
Each job sits beside its photographs, captioned with what each one shows. Open any photograph to see it full size, then use the arrow keys or swipe through the rest of that job.
All 116 photographs from 16 jobs
House demolition
05 photographs
House removal with the excavator and tipper sharing the block, followed by cleared ground.
House demolition
12 photographs
Taking down a house in stages, with water used to manage dust beside neighbouring homes.
House demolition
04 photographs
A staged house demolition between neighbouring homes, seen from the air and at ground level.
House demolition
17 photographs
Removing a two-storey house below road level, loading the truck from the lower work area.
Excavation
08 photographs
Excavating below neighbouring buildings, with spoil removal through a tight street entry.
Excavation
08 photographs
Compact machines between boundary walls, with standing water and little room to turn.
Excavation
05 photographs
Raking and grading a residential site between retained boundary fences.
Asbestos removal
Ceilings, eaves and internal linings removed on four Sydney jobs, photographed before, during and after the work.
About these jobsAsbestos removal
02 photographs
About 12 m² of asbestos ceiling sheeting taken down from a garage for Trojan Demolition.
The challengeA morning turnaround, with the job finished by 10am on 24 August.
Asbestos removal
02 photographs
Asbestos sheeting removed from the eaves over a covered outdoor area. We sealed the walls, doors and windows with plastic first, and cleaned the area once the sheeting was out.
The challengeProtecting the existing walls, windows and doors while working overhead.
Asbestos removal
01 photographs
Asbestos removed from the ceilings and walls of a laundry and toilet, with the doorway sealed off from the rest of the house while we worked.
The challengeIsolating the work area from the rest of the house and working around existing services.
Asbestos removal
02 photographs
Asbestos removed from a storage room’s ceiling and walls, and from the laundry ceiling.
The challengeRemoving the linings within confined rooms while protecting the remaining structure.
Strip-out
07 photographs
Removing internal linings by hand while retaining the building’s exposed framework.
Site clearing
09 photographs
Breaking up concrete and loading rubble while keeping a route through the site.
Site clearing
04 photographs
Sorting brick and timber on a residential block, with the truck loading inside the site.
Site clearing
09 photographs
Removing roots, stumps and unwanted growth while working around retained vegetation.
Site clearing
05 photographs
Raking and clearing a residential block, with truck access kept within the fences.
More from our sites
16 photographs
Machines at work, buildings coming down and cleared ground from our earlier Sydney jobs. These photographs aren’t tied to one of the jobs above, so each is captioned with what it shows.
Want the whole story behind a job? Our project pages walk through the site, the challenge and how we ran the work.
See all 12 projects
Get a free quote
Send us a few photos of your site with the enquiry. We’ll talk through the work, the access and what needs to stay, then confirm the scope and price in writing.
0402 548 0047 days a week · 7am–7pm