Skip to content

Clear today. Build tomorrow.Demolition and excavation across Sydney

Open 7 days · 7am–7pm

15 Sydney demolition planning guides

Know the cost. Know the rules.

What it costs, which approvals you need and what your council asks for, written by a licensed Sydney demolition contractor for homeowners and builders. Every figure and rule is dated.

5.0 from 22 Google reviews
Excavator alongside the partially removed house
BrookvaleHouse demolition · Our work
View the work
  • What will it cost?5 cost guidesHouse, asbestos, excavation, garage and pool, clearingSee the costs
  • Which approval?DA or CDCNSW approvals, asbestos and licencesSee the rules
  • How does it run?6 stagesFrom the scope to the cleared blockSee the process
  • What does council ask?6 councilsCouncil by council across northern SydneyFind your council

Demolition costs

What will it cost?

Our own house demolition prices with worked examples, and typical Sydney prices for asbestos removal, excavation, garage and pool removal and land clearing.

Start with the price · 5 min read

House demolition cost in Sydney

Compare house demolition price bands, worked examples and the work priced separately.

Our price bands for a detached house with reasonable access, including GST
HouseFloor areaInc. GST
Single-storey80–under 150 m²$15,000–$25,000
Single-storey150–under 250 m²$20,000–$35,000
Single-storey250–350 m²$30,000–$45,000
Double-storey200–350 m²$35,000–$55,000

Asbestos, slabs, pools, trees, approvals and difficult access are priced separately. Your written quote confirms what is included.

How a demolition runs

Start to finish.

Every demolition runs in the same order: scope, then approvals, notices and disconnections, then any asbestos, then the building, then the clean-up and handover. Each stage links to the part of the guide that explains it.

  1. Look at the site and agree the scope

    Every job starts with what is coming down and what the site is like.

    Read this stage
  2. Approvals, notices and disconnections

    The approval comes first: a CDC or a DA, with its conditions.

    Read this stage
  3. Keep people clear of the work

    The work area is fenced off from everyone not on the job, with an exclusion zone wherever material could fall.

    Read this stage
  4. Asbestos and salvage first

    The materials in the house set the order of work.

    Read this stage
  5. The house comes down

    The method suits the building and the site, and follows the Australian Standard for demolition, AS 2601.

    Read this stage
  6. Clear the block and hand it over

    Material is sorted by type and trucked away as agreed.

    Read this stage

How long does it take? As a standard guide, the machine work on a single-storey house typically takes 2–5 days on site once approvals and disconnections are in place; a double-storey house, or a sloping or tight site, takes longer.

Get a free quote

Ready to price
your job?

Send the address and a few photos. We’ll talk through the work, look at the site where it needs it and put the price in writing.

0402 548 0047 days a week · 7am–7pm
  1. We talk it throughYour plans, what stays and when your builder needs the block.
  2. We look at the siteWhere the job needs it, before we price the work.
  3. You get a written quoteThe scope, separately priced items and the agreed finish.
5.0 from 22 Google reviews

Tell us about the job

* Required fields

Your details
The site and the work
Work needed, what stays, access and timing.
Add photos or plans Optional
Up to 5 photos or PDF plans, 4 MB in total. You can add them in more than one go.
PDF plan requirements

Up to 100 pages, without passwords, comments, markups, fillable fields or scripts. If a PDF won’t go through, send photos of the pages instead.

We only use these details to reply to your enquiry. Privacy policy.