Start with the actual address
Council requirements vary in the Inner West. Your street address decides which council and controls apply.
49 suburbs in the Inner West
Full or partial pool removal, with backfill and final levels planned around your next use. Tell us whether the area will become a garden, paving or a possible building site.
5.0 from 22 Google reviews
Every suburb we cover in the Inner West has its own pool removal page, with the local checks and a quote form set to that suburb.
49 suburbs
Browse all 49 suburbsThree decisions set the scope and the price. We agree each one with you in writing before the work is booked.
The whole shell and agreed surrounds are removed, then the area is backfilled and compacted. If you may build there later, your engineer and certifier confirm the requirements.
The upper shell is broken down, drainage through the base is addressed and the remaining pool is filled. It may suit a lawn or garden, but does not suit every site or later building plan.
Agree the fill material, compaction, finished levels and any inspections or records before starting. A filled pool is not automatically ready to build on.
Excavation for your next stageThese pool-removal examples illustrate shell breakout, equipment access and material removal. The method for your property depends on the pool and what you plan to do with the space.
Supporting photographsNot an Active job or a local project



Customer reviews
Good price, respectful, attended to detail for us, on time and on budget.
After weeks of putting us off and not giving us a start time, we had to look elsewhere and Active were able to fit us in at short notice. Very impressed with how the lot was left.
Professional and helpful during the entire process and took great care in leaving the place spotless and safe.
Pool construction and size, full or partial removal, equipment access, spoil, fill and compaction requirements all change the job.
Get a free quoteRead our garage and pool removal cost guideSydney market guide
Not Active’s price list. Each site is quoted individually. Checked 10 October 2026. GST not stated.
| Job | Typical range | What the figure covers |
|---|---|---|
| Concrete pool, partial removal and backfill | $3,500–$10,000 | Sydney and NSW guides; part of the shell stays in the ground. |
| Concrete pool, full removal | $8,000–$18,000 | Sydney and NSW guides; the whole shell comes out before backfill. |
| Fibreglass pool, full removal | $8,000–$15,000 | Guides differ widely; one Sydney guide puts it at $10,000–$20,000. |
What these rates cover
For a standard-size in-ground pool with machine access to the backyard, including backfill. Difficult access, a deep pool, coping and paving, and compaction testing are usually extra.
Confirm approval, drainage and backfill requirements for the actual property. The intended use of the filled area determines any engineering, inspections and compaction records.
Council requirements vary in the Inner West. Your street address decides which council and controls apply.
Open the council that covers your property.
Burwood needs a permit before anyone uses, closes or works on its road, footpath or nature strip, including for loading, work zones and hoardings.
Burwood permits for work on council property (opens in a new tab)A skip on your own block needs no application. One on a Canada Bay road needs council approval, fees and a refundable bond, a week at a time, so we load on your block wherever we can.
Canada Bay skip bins on public land (opens in a new tab)Canterbury-Bankstown assesses trees with the development application. Trees that stay are fenced off with no machines or digging inside the fence, which shapes how we work the block.
Canterbury-Bankstown trees and development (opens in a new tab)Some City of Sydney approvals need a construction traffic management plan, which sets out how trucks, loading and pedestrians are handled. If yours does, we work to it.
City of Sydney construction traffic plans (opens in a new tab)City of Sydney expects loading to happen inside the site. If that isn’t possible, an on-street works zone needs its own approval, and some streets aren’t suitable.
City of Sydney works-zone approval (opens in a new tab)Cumberland needs a permit for a skip on the road, another to fence off part of a road or footpath, and a hoarding permit for temporary fencing on a footpath. A works zone for trucks is a separate application.
Cumberland works within roads and footpaths (opens in a new tab)A skip or building waste bin on a Parramatta street or footpath needs a Waste Container Permit, applied for before any work in the road reserve. Hoardings and scaffolding over the road need approval too.
Parramatta permits for temporary use of public space (opens in a new tab)In Strathfield, removing a tree that is part of a heritage item, inside a conservation area or on the significant tree register needs a development application. If the tree goes as part of a building application, no separate tree application is needed.
Strathfield tree pruning and removal (opens in a new tab)Council guidance checked between 15 September 2026 and 2 October 2026. These are matters to check, not a determination for an individual address. Your council or certifier confirms what applies.
Three stages, in the order they happen. Who arranges each item is agreed before the job is booked.
Assess the pool and access, then confirm the removal method with any engineering or approval requirements.
Complete the agreed removal and take out the material that is not part of the approved fill arrangement.
Backfill and compact to the agreed requirements, with final levels, inspections and records confirmed for the intended use.
Quotes are free. Call 7 days, 7am–7pm, or send the details and photos with the form below.
More about pool removalThe fill, compaction and drainage depend on how the area will be used and on any engineering requirements for a future building. We confirm the fill and the finish in your quote.
Yes. Tell us before we start, because it changes the job: the pool is removed and the hole filled and compacted to your engineer’s and certifier’s requirements, with compaction testing where they ask for it.
Yes, if you want them gone. The coping, paving, fencing, pump and piping are listed in the quote, with anything staying marked and protected.
We cover 297 suburbs across 8 areas of Sydney. Choose the area where the work is.

Get a free quote
Send pool dimensions and photos of the pool and side access. Tell us what you want to use the space for, including any possible future building.
0402 548 0047 days a week · 7am–7pm