Skip to content

Clear today. Build tomorrow.Demolition and excavation across Sydney

Open 7 days · 7am–7pm

North Shore · Beecroft NSW 2119

House demolition Beecroft.

House removal, material clearance and an agreed finish for your next build. We assess the structure, access and anything you need to retain before preparing your written quote.

5.0 from 22 Google reviews
Excavator beside a pile of brick rubble and roof timber, with water spraying across the remaining walls
KillaraHouse demolition · Our work
View the work

House demolition in BeecroftA clear scope
for the whole house.

Three decisions set the scope and the price. We agree each one with you in writing before the work is booked.

  1. The house and its materials

    The agreed roof, walls, frame, fixtures and fittings come down in a planned order. Demolition material is sorted and removed from the site.

  2. What stays on the block

    Identify fences, trees, driveways and neighbouring structures to protect. Attached, semi-detached or partly retained buildings need a site-specific assessment.

  3. The finish for your builder

    Agree whether slabs and footings stay or come out. Asbestos, concrete removal and any excavation are separately assessed and priced.

    Planning excavation too?

Our work on the North ShoreFrom a house
to clear ground.

A staged house demolition between neighbouring homes, seen from the air and at ground level.

Explore the Killara project
Overhead view of the house demolition, excavator and truck
Killara · Our work
Overhead view of the demolition footprint and material piles
Killara · Our work

More house demolition work

All our projects

Customer reviews

Good work.
In their words.

An excellent choice for asbestos removal and demolition of our house. Explained the whole process clearly and helped organise electrical disconnection and tree removal.
Joshua Q.Google review · November 2024
Very professional, considerate of our neighbours, and very efficient. The house was down in just over a week.
Ben K.Google review · August 2020
Just had my house, garage and 3 trees demolished… The builder was very impressed with the cleared block which is on a slope with difficult access.
Nick E.Google review · August 2021

House demolition costsWhat shapes
the price?

House size and materials, truck access, asbestos and the agreed finish change the price. Tell us about anything attached to the house and what your builder needs next.

Get a free quoteTry the cost calculator
Indicative prices, including GST

Detached-house structure with reasonable access. Floor area is the total across all storeys.

Indicative house demolition prices including GST
House & floor areaPrice inc. GST
Single-storey80–under 150 m²$15,000–$25,000
Single-storey150–under 250 m²$20,000–$35,000
Single-storey250–350 m²$30,000–$45,000
Double-storey200–350 m²$35,000–$55,000

Asbestos, slabs, footings, pools, trees, excavation, approvals, disconnections and difficult access are priced separately. Your written quote confirms what is included. House demolition cost guide

Your property in BeecroftBefore work
starts.

Confirm the demolition approval and any conditions for trees, neighbouring structures, work hours and material removal before booking the work.

Agree the trees before the machinery

Hornsby usually needs a permit to prune or remove trees on private land, and trees affected by a new build are assessed with the development application. Settle which trees stay before we plan machine access.

Hornsby trees on private property (opens in a new tab)

Council guidance checked 2 October 2026. These are matters to check, not a determination for an individual address. Your council or certifier confirms what applies.

How a house demolition runsFrom enquiry
to handover.

Three stages, in the order they happen. Who arranges each item is agreed before the job is booked.

  1. 01

    Assess and agree

    We review the house, access and retained features, then set out the scope, responsibilities and price.

  2. 02

    Prepare before demolition

    Confirm approvals and disconnections, protect the site and arrange any asbestos removal and independent clearance before the main work.

  3. 03

    Remove and hand over

    Take down the agreed structure, sort and remove material, then check the cleared footprint against the agreed finish.

Allow 2–4 weeks for the demolition stage, including disconnections and any asbestos removal; machine work on a single-storey house typically takes 2–5 days. We confirm the timing for your job with the quote.

Read the process guide

Your questions answered

Before
you book.

More questions answered
Does the price include asbestos, slabs and footings?

No. The indicative house bands cover the detached-house structure with reasonable access. Asbestos, slabs and footings, pools, trees, excavation, approvals, disconnections and difficult access are priced separately. Your written quote confirms the complete scope.

Can you demolish an attached or semi-detached house?

It needs a site-specific assessment. The connection to the retained building, structural support and any approval or engineering requirements must be confirmed before agreeing the work.

How long does house demolition take?

Typical machine work on a single-storey house takes 2–5 days after preparation. The broader demolition stage commonly takes 2–4 weeks, including disconnections and any asbestos removal. Approvals, provider lead times, weather and site conditions can extend the programme.

Who arranges approvals and disconnections?

You and your builder confirm the plans and handover needed. We can coordinate approvals, utility disconnections, asbestos removal and clearance as part of the job. We agree who books and pays for each item before work is booked.

House demolition near BeecroftNearby
suburbs.

Work on a nearby street? Each suburb has its own house demolition page and a quote form set to that suburb.

Beecroft in white, with the nearby suburbs we cover in gold.Map adapted from suburb boundaries © State of New South Wales (Spatial Services, a business unit of the Department of Customer Service NSW), CC BY 4.0

Get a free quote

Let’s plan your house demolition
in Beecroft.

Send the address, a few photos and any plans. Tell us what should stay and whether slabs, footings or other structures need to be removed.

0402 548 0047 days a week · 7am–7pm
  1. We talk it throughYour plans, what stays and when your builder needs the block.
  2. We look at the siteWhere the job needs it, before we price the work.
  3. You get a written quoteThe scope, separately priced items and the agreed finish.
5.0 from 22 Google reviews

Tell us about the job

* Required fields

Your details
The site and the work
Work needed, what stays, access and timing.
Add photos or plans Optional
Up to 5 photos or PDF plans, 4 MB in total. You can add them in more than one go.
PDF plan requirements

Up to 100 pages, without passwords, comments, markups, fillable fields or scripts. If a PDF won’t go through, send photos of the pages instead.

We only use these details to reply to your enquiry. Privacy policy.