Start with the actual address
Council requirements vary on the North Shore. Your street address decides which council and controls apply.
72 suburbs on the North Shore
House removal, material clearance and an agreed finish for your next build. We assess the structure, access and anything you need to retain before preparing your written quote.
5.0 from 22 Google reviews
Every suburb we cover on the North Shore has its own house demolition page, with the local checks and a quote form set to that suburb.
72 suburbs
Browse all 72 suburbsThree decisions set the scope and the price. We agree each one with you in writing before the work is booked.
The agreed roof, walls, frame, fixtures and fittings come down in a planned order. Demolition material is sorted and removed from the site.
Identify fences, trees, driveways and neighbouring structures to protect. Attached, semi-detached or partly retained buildings need a site-specific assessment.
Agree whether slabs and footings stay or come out. Asbestos, concrete removal and any excavation are separately assessed and priced.
Planning excavation too?A staged house demolition between neighbouring homes, seen from the air and at ground level.
Explore the Killara project

Customer reviews
An excellent choice for asbestos removal and demolition of our house. Explained the whole process clearly and helped organise electrical disconnection and tree removal.
Very professional, considerate of our neighbours, and very efficient. The house was down in just over a week.
Just had my house, garage and 3 trees demolished… The builder was very impressed with the cleared block which is on a slope with difficult access.
House size and materials, truck access, asbestos and the agreed finish change the price. Tell us about anything attached to the house and what your builder needs next.
Get a free quoteTry the cost calculatorDetached-house structure with reasonable access. Floor area is the total across all storeys.
| House & floor area | Price inc. GST |
|---|---|
| Single-storey80–under 150 m² | $15,000– |
| Single-storey150–under 250 m² | $20,000– |
| Single-storey250–350 m² | $30,000– |
| Double-storey200–350 m² | $35,000– |
Asbestos, slabs, footings, pools, trees, excavation, approvals, disconnections and difficult access are priced separately. Your written quote confirms what is included. House demolition cost guide
Confirm the demolition approval and any conditions for trees, neighbouring structures, work hours and material removal before booking the work.
Council requirements vary on the North Shore. Your street address decides which council and controls apply.
Open the council that covers your property.
Hornsby’s heritage guidance says the important parts of a heritage-listed property, including buildings and fences, can’t be demolished, while other parts can come down with approval. Its rules also cover conservation areas, so check the address before planning a full knockdown.
Hornsby heritage property controls (opens in a new tab)Hornsby usually needs a permit to prune or remove trees on private land, and trees affected by a new build are assessed with the development application. Settle which trees stay before we plan machine access.
Hornsby trees on private property (opens in a new tab)Hunters Hill has seven heritage conservation areas and hundreds of heritage-listed places. Check your address on the heritage maps before planning any demolition.
Hunters Hill heritage areas and items (opens in a new tab)Hunters Hill expects skips to sit on private property. A skip on the road needs council approval at least seven business days ahead, with lights, barriers and cones.
Hunters Hill skip bin permit (opens in a new tab)Ku-ring-gai’s heritage maps show listed houses and conservation areas, and its rules can also cover the land around a listed house. Check yours first; if part of the property has to stay, we’ll plan access around it.
Ku-ring-gai heritage controls and approvals (opens in a new tab)Lane Cove sends owners to the NSW Planning Portal to look up the rules for an address. Use it to see what applies to your block, then tell us what has to stay, including trees.
Lane Cove property mapping (opens in a new tab)Mosman’s maps show heritage-listed houses and conservation areas, and rank how much each building contributes. A house that isn’t listed can still be in a conservation area, so check before planning a full knockdown.
Mosman heritage listings and conservation areas (opens in a new tab)Mosman Council suggests a planning certificate to confirm whether your property is heritage-listed; the online maps are only a starting point. Your certifier or council confirms the approval route.
Mosman planning certificates (opens in a new tab)North Sydney’s heritage rules treat listed houses and houses in conservation areas differently. Check your house’s status with council before deciding on a full knockdown.
North Sydney heritage and demolition controls (PDF) (opens in a new tab)If a skip, a truck or our machine needs a North Sydney Council road or footpath, you need a permit first. We plan loading on your block where we can and tell you early if the street is needed.
North Sydney road and footpath permits (opens in a new tab)City of Parramatta says it is highly unlikely to approve demolishing a heritage-listed house or one in a heritage conservation area. If yours could be either, speak to council’s heritage advisor before planning a knockdown.
Parramatta heritage development approvals (opens in a new tab)A skip or building waste bin on a Parramatta street or footpath needs a Waste Container Permit, applied for before any work in the road reserve. Hoardings and scaffolding over the road need approval too.
Parramatta permits for temporary use of public space (opens in a new tab)The City of Ryde’s development control plan has different rules for houses, business areas and particular sites. Your council or certifier can tell you which ones apply to your address.
City of Ryde development controls (opens in a new tab)Ryde’s waste plan covers the demolition stage separately from the build. Tell us whether excavation is part of the job so the quote is clear about what a cleared block includes.
Ryde demolition waste plan (PDF) (opens in a new tab)Willoughby’s maps show whether your house is heritage-listed or sits in a conservation area. If it does, tell us what has to stay and we’ll plan the job around it.
Willoughby conservation-area maps and guidance (opens in a new tab)Willoughby’s demolition waste form lists what is coming out, what can be reused or recycled, and where the rest goes. We fill in the material side with you, including where trucks can load and anything that has to stay.
Willoughby demolition waste plan (PDF) (opens in a new tab)Council guidance checked between 15 September 2026 and 2 October 2026. These are matters to check, not a determination for an individual address. Your council or certifier confirms what applies.
Three stages, in the order they happen. Who arranges each item is agreed before the job is booked.
We review the house, access and retained features, then set out the scope, responsibilities and price.
Confirm approvals and disconnections, protect the site and arrange any asbestos removal and independent clearance before the main work.
Take down the agreed structure, sort and remove material, then check the cleared footprint against the agreed finish.
Allow 2–4 weeks for the demolition stage, including disconnections and any asbestos removal; machine work on a single-storey house typically takes 2–5 days. We confirm the timing for your job with the quote.
Read the process guideNo. The indicative house bands cover the detached-house structure with reasonable access. Asbestos, slabs and footings, pools, trees, excavation, approvals, disconnections and difficult access are priced separately. Your written quote confirms the complete scope.
It needs a site-specific assessment. The connection to the retained building, structural support and any approval or engineering requirements must be confirmed before agreeing the work.
Typical machine work on a single-storey house takes 2–5 days after preparation. The broader demolition stage commonly takes 2–4 weeks, including disconnections and any asbestos removal. Approvals, provider lead times, weather and site conditions can extend the programme.
You and your builder confirm the plans and handover needed. We can coordinate approvals, utility disconnections, asbestos removal and clearance as part of the job. We agree who books and pays for each item before work is booked.
We cover 297 suburbs across 8 areas of Sydney. Choose the area where the work is.

Get a free quote
Send the address, a few photos and any plans. Tell us what should stay and whether slabs, footings or other structures need to be removed.
0402 548 0047 days a week · 7am–7pm