Start with the actual address
Council requirements vary in the Hills District. Your street address decides which council and controls apply.
14 suburbs in the Hills District
House removal, material clearance and an agreed finish for your next build. We assess the structure, access and anything you need to retain before preparing your written quote.
5.0 from 22 Google reviews
Every suburb we cover in the Hills District has its own house demolition page, with the local checks and a quote form set to that suburb.
14 suburbs
Browse all 14 suburbsThree decisions set the scope and the price. We agree each one with you in writing before the work is booked.
The agreed roof, walls, frame, fixtures and fittings come down in a planned order. Demolition material is sorted and removed from the site.
Identify fences, trees, driveways and neighbouring structures to protect. Attached, semi-detached or partly retained buildings need a site-specific assessment.
Agree whether slabs and footings stay or come out. Asbestos, concrete removal and any excavation are separately assessed and priced.
Planning excavation too?House removal with the excavator and tipper sharing the block, followed by cleared ground.
Explore the Brookvale project

Customer reviews
An excellent choice for asbestos removal and demolition of our house. Explained the whole process clearly and helped organise electrical disconnection and tree removal.
Very professional, considerate of our neighbours, and very efficient. The house was down in just over a week.
Just had my house, garage and 3 trees demolished… The builder was very impressed with the cleared block which is on a slope with difficult access.
House size and materials, truck access, asbestos and the agreed finish change the price. Tell us about anything attached to the house and what your builder needs next.
Get a free quoteTry the cost calculatorDetached-house structure with reasonable access. Floor area is the total across all storeys.
| House & floor area | Price inc. GST |
|---|---|
| Single-storey80–under 150 m² | $15,000– |
| Single-storey150–under 250 m² | $20,000– |
| Single-storey250–350 m² | $30,000– |
| Double-storey200–350 m² | $35,000– |
Asbestos, slabs, footings, pools, trees, excavation, approvals, disconnections and difficult access are priced separately. Your written quote confirms what is included. House demolition cost guide
Confirm the demolition approval and any conditions for trees, neighbouring structures, work hours and material removal before booking the work.
Council requirements vary in the Hills District. Your street address decides which council and controls apply.
Open the council that covers your property.
Blacktown’s demolition guide says the work must follow Australian Standard AS 2601 and, unless it is exempt, needs approval. The application includes a site plan, work plan, waste plan and, where asbestos or other hazards are found, a plan for those.
Blacktown demolition of buildings guide (PDF) (opens in a new tab)Blacktown doesn’t need to know about a skip on your own block. On the road reserve a skip can take no more space than a parked car, and council can point you to registered skip companies.
Blacktown skip bins on the road reserve (opens in a new tab)The Hills Shire looks at trees on your block and your neighbours’, including the effect of cut and fill, driveways and drainage. Taking the house down doesn’t mean the trees can go, so we plan machine access around the ones that stay.
The Hills tree and landscaping assessment guidance (opens in a new tab)Hornsby’s heritage guidance says the important parts of a heritage-listed property, including buildings and fences, can’t be demolished, while other parts can come down with approval. Its rules also cover conservation areas, so check the address before planning a full knockdown.
Hornsby heritage property controls (opens in a new tab)Hornsby usually needs a permit to prune or remove trees on private land, and trees affected by a new build are assessed with the development application. Settle which trees stay before we plan machine access.
Hornsby trees on private property (opens in a new tab)City of Parramatta says it is highly unlikely to approve demolishing a heritage-listed house or one in a heritage conservation area. If yours could be either, speak to council’s heritage advisor before planning a knockdown.
Parramatta heritage development approvals (opens in a new tab)A skip or building waste bin on a Parramatta street or footpath needs a Waste Container Permit, applied for before any work in the road reserve. Hoardings and scaffolding over the road need approval too.
Parramatta permits for temporary use of public space (opens in a new tab)Council guidance checked between 15 September 2026 and 2 October 2026. These are matters to check, not a determination for an individual address. Your council or certifier confirms what applies.
Three stages, in the order they happen. Who arranges each item is agreed before the job is booked.
We review the house, access and retained features, then set out the scope, responsibilities and price.
Confirm approvals and disconnections, protect the site and arrange any asbestos removal and independent clearance before the main work.
Take down the agreed structure, sort and remove material, then check the cleared footprint against the agreed finish.
Allow 2–4 weeks for the demolition stage, including disconnections and any asbestos removal; machine work on a single-storey house typically takes 2–5 days. We confirm the timing for your job with the quote.
Read the process guideNo. The indicative house bands cover the detached-house structure with reasonable access. Asbestos, slabs and footings, pools, trees, excavation, approvals, disconnections and difficult access are priced separately. Your written quote confirms the complete scope.
It needs a site-specific assessment. The connection to the retained building, structural support and any approval or engineering requirements must be confirmed before agreeing the work.
Typical machine work on a single-storey house takes 2–5 days after preparation. The broader demolition stage commonly takes 2–4 weeks, including disconnections and any asbestos removal. Approvals, provider lead times, weather and site conditions can extend the programme.
You and your builder confirm the plans and handover needed. We can coordinate approvals, utility disconnections, asbestos removal and clearance as part of the job. We agree who books and pays for each item before work is booked.
We cover 297 suburbs across 8 areas of Sydney. Choose the area where the work is.

Get a free quote
Send the address, a few photos and any plans. Tell us what should stay and whether slabs, footings or other structures need to be removed.
0402 548 0047 days a week · 7am–7pm